New installation of Sanitary, Watermain and Storm works on Beatty Line, Sideroad 18 and Strathlea subdivision including services.  Site Dewatering by well point method was required for all the underground works including a box culvert on Sideroad 18.  Reconstruction of the Sideroad 18 included gabion walls, electrical conduit, ditches, slopes, sidewalks, curbs, asphalt resurfacing, restoration...
MORE
The 2015 Region of Waterloo Surface Asphalt included the surface asphalt placement of 3 major arterial routes in the area; Townline Rd. (Cambridge), Dundas St. (Cambridge) and Church St. (Elmira). The work on these 3 routes included base repairs, MH and CB adjustment and concrete curb repairs. There were 5 other streets that required a...
MORE
A greenfield site development with of a new auto mall, major components include; • Site earthworks including cut/ fill on site and importing structural fill • 1200 lineal meters of sanitary sewer • 4500 lineal meters of storm sewer ranging in size from 2250 mm to 300 mm • 3000 lineal meters of water main • ADS storm water retention...
MORE
  • Complete road reconstruction with full road, storm sewers, water service relocation, curb and gutter and restorations, Street lighting
  • Maintained access to all home owners throughout construction with minimal impacts
  • Proposed a change in Design from the owners original design to change from Asphalt curb and gutter to concrete curb and gutter which resulted in...
MORE
Complete road reconstruction of a 2 lane rural road, project included; • 16,000 m3 of excavation • 1,000 m3 of rock excavation • 40,000 tonne of granular • 5,000 tonne of asphalt • storm sewer • driveway culverts Project successes were achieved through open lines of communication between the Owner, Design Engineer/ Contract Administrator, and Capital to resolve issues promptly and minimize...
MORE
A new Parclo A4 interchange was constructed at MTO Hwy #6 and Laird Rd, including reconstruction and widening of a 2.4 km section of Hwy #6, and reconstruction of the adjacent Southgate Dr./Laird Rd. intersection. The ownership of this project was shared between the MTO and the City of Guelph in an effort to boost...
MORE
Upgrading the Storm Water Management system for Cargill Meat Solutions in Guelph consisted of 7m deep Stormceptor through solid bed rock. This required extensive chipping and excavation and careful planning to remove required material and maintain safe working conditions to install the structure. Excavation and re-grading of 13000m2 of parking area was required to introduce...
MORE
The project was a parking lot at the Cineplex theatre in Kitchener. Capital was responsible for supply and installation of all curbs and sidewalks on the project. We were also responsible to fine grade and pave the lot with Hot Mix Asphalt. At the cross walks, Capital placed red asphalt and placed a pattern into the pavement...
MORE
- Fine grade stone base and formed and poured new concrete sidewalk - Fine grade and poured new parking lot curbs - Fine grade stone and pave new parking lot and playground area. Capital worked under a very tight schedule, the work needed to be completed before school opened in September and Devlan was only able to provide...
MORE
- remove and replaced concrete sidewalks. - remove and replaced asphalt at various locations. - remove asphalt at bus stations and form and pour new coloured concrete. The work was completed on time and to the full satisfaction of the owner. Constant co-ordination needed to be done on a daily basis because the project consisted of areas throughout...
MORE